ID | 555 |
---|---|
Citation | EBA Engineering Consultants Ltd. 1999. Reconnaissance Channel Assessment Procedure (ReCAP) as part of the Interior Watershed Assessment Procedure for Upper Creighton Creek, Boneau Creek and Ferry Creek. Prepared for Tolko Industries Ltd. |
Organization | Tolko Industries |
URL | http://a100.gov.bc.ca/pub/acat/public/viewReport.do?reportId=23844 |
Abstract/Description or Keywords | Each of the three watersheds examined in this study were divided into sub-basins and a residual based on stream ordering using 1:20,000 TRIM mapsheets. Only reaches in the mainstem portion of the channel were examined. The mainstem of the channel includes the highest order channel in the watershed and the highest order channel in each sub-basin. Channel networks are partitioned into distinct reaches to provide a systematic framework within which to assess channel characteristics and to compare consistent channel types throughout a watershed. channel, erosion, road |
Information Type | report |
Regional Watershed | Shuswap |
Sub-watershed if known | Upper Creighton Creek, Boneau Creek and Ferry Creek |
Aquifer # | |
Comments | |
Project status | complete |
Contact Name | |
Contact Email |