Abstract/Description or Keywords |
The objectives for this project were to: 1 Conduct topographic surveys and prepare detailed restoration designs, as preliminary construction drawings, for two priority sites identified in Gaboury and Slaney (2003). The restoration designs pertain to sediment traps near Hollywood Road, and setting back dykes in the vicinity of the Casorso Road bridge crossing. 2. Conduct detailed topographic surveys and prepare plan and cross section view drawings of the Benvoulin Woods area. The drawings will be used as a basis for the presentation of restoration designs for setting back dykes, and reconstructing meanders and floodplains in the Benvoulin Woods area. 3. Conduct site assessments and contact appropriate individuals from the City of Kelowna, CORD, landowners and stakeholders to discuss the three restoration projects. Document and incorporate the input and recommendations from these individuals into a detailed implementation plan. 4. Estimate the costs to purchase the required land and construct the restoration works. restoration, aquatic habitat, channel, erosion, riparian, geomorphology |