Abstract/Description or Keywords |
The purpose of this report is to evaluate the existing flood risk to the City of Kimberley based on a 1 in 200 year recurrence interval instantaneous peak flood flowing through the existing Mark Creek flume. This initial report will lay the ground work for the following report by LCI, "Mark Creek Flume - Stream Rehabilitation Project", in which multidisciplinary criteria is integrated into the design of a new stream channel. US Army Corps of Engineers River Analysis Model; hydraulic model; diversion; danger to the public; warning signs |