Water Stewardship Information Sources

Citation Jakob, M, Bovis, M and Oden, M. 2005. The significance of channel recharge rates for estimating debris-flow magnitude and frequency. Earth Surface Processes and Landforms 30:755-766.
Organization BGC Engineering
URL http://onlinelibrary.wiley.com/doi/10.1002/esp.1188/abstract
Abstract/Description or Keywords Keywords:
debris flows;magnitude;frequency;channel recharge
Abstract
The quantification of debris-flow hazard requires estimates of debris-flow frequency and magnitude. Several methods have been proposed to determine the probable volume of future debris flows from a given basin, but most have neglected to account for debris recharge rates over time, which may lead to underestimation of debris-flow volumes in basins with rare debris flows. This paper deals with the determination of debris recharge rates in debris-flow channels based on knowledge of debris storage and the elapsed time since the last debris flow. Data are obtained from coastal British Columbia and a relation is obtained across a sample of basins with similar terrain and climatic conditions. For Rennell Sound on the west coast of the Queen Charlotte Islands, the power-law relation for area-normalized recharge rate, Rt, versus elapsed time, te was Rt = 0·23te−0·58 with an explained variance of 75 per cent. A difference in recharge rates may exist between creeks in logged and unlogged forested terrain. The power function for undisturbed terrain was Rt = 0·20te−0·49, while the function for logged areas was Rt = 0·30te−0·77. This result suggests that for the same elapsed time since the last debris flow, clearcut gullies tend to recharge at a slower rate than creeks in old growth forest. This finding requires verification, particularly for longer elapsed times since debris flow, but would have important implications for forest resource management in steep coastal terrain. This study demonstrates that commonly used encounter probability equations are inappropriate for recharge-limited debris flow channels.
Information Type Article
Regional Watershed Haida Gwaii
Sub-watershed if known
Aquifer #
Comments
Project status
Contact Name Matthias Jakob
Contact Email [email protected]