ID | 702 |
---|---|
Citation | Giles, T. 1999. Detailed Terrain Stability Mapping of the Upper North Thompson River Area (BAPID 4676). BC Ministry of Forests. |
Organization | FLNRO |
URL | http://a100.gov.bc.ca/pub/acat/public/viewReport.do?reportId=36068 |
Abstract/Description or Keywords | The objective of this project was to prepare I :20,000 scale maps of terrain and terrain stability for the Upper North Thompson River study area. The study area is located approximately 35 kilometres (km) south-west of Valemount in east-central British Columbia within the Clearwater Forest District. BAPID 4676 The objective of this project was to prepare I :20,000 scale maps of terrain and terrain stability for the Upper North Thompson River study area. The study area is located approximately 35 kilometres (km) south-west of Valemount in east-central British Columbia within the Clearwater Forest District. The study area extends upstream from the confluence of an unnamed creek entering the North Thompson River from the south, proximately 2 km upstream from the confluence of Lebher Creek and the North Thompson River. The study boundary reflects the operational limits in this portion of the North Thompson River valley and is located within Terrain Resource Inventory Map (TRIM) sheets 830.052, 53, 062 and 063. terrain stability, landslide, erosion, geomorphology, surficial geology |
Information Type | report |
Regional Watershed | North Thompson |
Sub-watershed if known | |
Aquifer # | |
Comments | |
Project status | complete |
Contact Name | Tim Giles |
Contact Email | [email protected] |