Water Stewardship Information Sources

ID 428
Citation Dobson Engineering Ltd. 1997. Interior Watershed Assessment for the Harris Creek Watershed. Prepared for Riverside Forest Products Ltd.
Organization Riverside Forest Products Ltd
URL http://a100.gov.bc.ca/pub/acat/public/viewReport.do?reportId=8268
Abstract/Description or Keywords The following report has been prepared for the Riverside Forest Products Limited, Lumby Division. A watershed assessment for Harris Creek has been completed to determine the potential for any cumulative hydrologic impacts resulting from past forest development. This report presents the results of a second IWAP analysis in the Harris Creek watershed which incorporates previously unavailable terrain mapping information. Terrain Survey Intensity Level B mapping was completed for the watershed in July, 1997 by Geoterrain Consultants. The results of this analysis are therefore considered to better reflect existing watershed conditions than those in the November, 1996 analysis. The Harris Creek watershed is located approximately 5 km south of the Village of Lumby in the Vernon Forest District. The point of interest (POI) is at the confluence of Harris Creek and Nicklen Creek. For assessment purposes, the Harris Creek watershed was divided into six sub-basins and one residual. Appendix C Watershed and Sub-basin Map is not available in EcoCat.
Information Type report
Regional Watershed Shuswap
Sub-watershed if known Harris Creek
Aquifer #
Comments
Project status complete
Contact Name
Contact Email