Citation Summit Environmental Consultants Ltd. 2012. Shuswap Project Water Use Plan: Flow Disruptions at Wilsey Dam, Implementation Year 1 Final Report on Findings, Study Period: April 2009 - Mar 2011. Prepared for BC Hydro
Organization BC Hydro
URL http://www.bchydro.com/content/dam/BCHydro/customer-portal/documents/corporate/environment-sustainability/water-use-planning/southern-interior/flow-disruptions-wilsey-dam-shuworks-1-final-report-december2012.pdf
Abstract/Description or Keywords BC Hydro recently completed a three year field study on flow disruptions in the Middle Shuswap River caused by
sudden outages at the Shuswap River Generation Station (SRGS). The purpose of this study was to assess the
effectiveness of upgrades to the bypass valve (BPV) in reducing the frequency and magnitude of flow disruptions
and the resulting impacts on fisheries populations downstream of Wilsey Dam. Summit was recently retained by
BC Hydro to complete a technical assessment of these data. The primary objectives of this assessment were to:
x Summarize the magnitude, duration and rate of water level changes during SRGS outages;
x Assess the potential impacts on fisheries populations in the Middle Shuswap River due to water level
reductions;
x Determine the effectiveness of the BPV upgrades according to performance measures outlined in the
WUP;
x Identify information gaps critical to the above tasks; and
x Provide recommendations, as necessary.
Summit completed a preliminary assessment on the effectiveness of the BPV upgrades which was submitted to
BC Hydro on May 24, 2012 . The following letter provides a technical assessment of flow disruptions and the
potential impacts on fish and fish habitat downstream of Wilsey Dam. This letter also elaborates on the
effectiveness of the BPV upgrades from an operational and fisheries perspective. A gap assessment identifies
additional data and information to refine this assessment and is presented below along with recommendations on
the next steps. reservoir, fisheries, aquatic habitat, environmental flows, low flows
Information Type report
Regional Watershed Shuswap
Sub-watershed if known Shuswap River
Aquifer #
Comments
Project status complete
Contact Name
Contact Email